Zum Inhalt springen
Startseite » Reports

Reports

  • D 2.1 Description of final RENVEOPE supply concepts for all 3 Demo objects (M12)
  • D 2.2 Monitoring concepts for all 3 Demo objects (M12)
  • D 2.3 Joint publishable report on the findings of all 3 Demo objects (M36)
  • D 3.1 Report on design, prefabrication and assembly regime for RENVELOPE
  • D 3.2 System level experimental results of the laboratory test procedures
  • D 3.3 Report on final design for RENVELOPE based on demo findings (M36)
  • D 4.1 Report on optimization measures for individual technologies based on experiments in WP3 (M18)
  • D 4.2 Report on technology packages and system integration into RENVELOPE (M16)
  • D 4.3 Report on final design for individual technologies based on demo findings (M36)
  • D 5.1 Description of design constraints and technical requirements for WP3 (M3)
  • D 5.2 Façade element catalogue (M6)
  • D 5.3 Report on replication potential of existing building stock (M6)
  • D 5.4 Report on architectural potential and on-site processes of RENVELOPE (M18)
  • D 5.5 Report on final architectural design and on-site processes based on demo findings (M36)
  • D 6.1 Report on digitalized process chain throughout the RENVELOPE life cycle (M18)
  • D 6.2 Operational digital twin for all three demo sites (M30)
  • D 6.3 Report on developed load management algorithms (M18)
  • D 6.4 Report on optimization measures for digital twin and load management from demo operation (M36)
  • D 7.1 Report on stakeholders and target audiences (M4)
  • D 7.2 Operational RENVELOPE MARKET Activation Platform (M30)
  • D 7.3 Report on the completed end-user integration process (M36)